Project type : Comercial
Application : Mall
Year : June-2022
Location : Shiraz-IRI
Additional Information and Details: I Designed that project with Revit and HVAC Solution, but we needed BOM (Bill Of Material) and an isometric plan. Thats Why I redesigned it with Plant3d. Plant 3d gives us a lot of opportunity such as BOM list, Isometric plan, 3d plan and it was very fast and easy to work.
Project type : Mall
Application : Central Mech Room Designe by BIM method and Revit MEP.
Year : 2022
Location : Shiraz-IRAN
Project type : Office
Application : Chiller Piping Design - Observating - 3d - BIM
Year : 2021
Location : IRI - Shiraz
Additional Information and Details: That Project was related to Shiraz central municipality building. It was very important and critical. Everything and every detail were very special and I had to check it. So BIM method was very helpful and useful. I had to design piping and estimate install conditions for the 3700kw air-cooled chiller.
Project type : Residential
Application : 3D -Air Condition - Heating and Cooling- Analyse
Year : 2021
Location : IRI - Shiraz
Additional Information and Details: Full load Cooling and heating capacity of that buildings were analyzed. That residential project has included 3 high-rise towers. Air-condition is provided by the central mech room. Thats why, the correction of calculation and simulation was very crucial.
Project type : Complex Mall
Application : BIM - 3D - Duct Design and Simulation
Year : 2021
Location : IRI - Shiraz
Additional Information and Details: The level of sound was very important and critical for my client. That's why I tried to simulation its line in Revit. There fore according to thats result, in the primary; line our airspeed didn't increase from 1800fpm and in the secondary line our airspeed was under 700fpm. Also, I had to considered the height of the ceiling.
Project type : Complex Mall
Application : MechRoom - BIM - Constulting - Piping - 3D
Year : 2021
Location : IRI - Shiraz
Additional Information and Details: According to that building have various applications such as restaurant, day clinic, hotel, mall, that's mech room location was very difficult. I had to consider the level of noise, near to main pipe, air-cooled equipment, maintenance, efficiency. On the other hand, my client wanted to fund a very luxurious restaurant on the roof. Finally, I found a place and try to establish a mech room based on two-level. The first level only for pumps and collectors and the second level only for air-cooled equipment like chillers.
I have always been a big fan of using some program to calculate a project. You Know find it wiser and a practical method to will get better conditions in our project.
So, my projects were analyzed by tow program HAP (Hourly Analysis Program) and Revit.
After spending some years and gaining practice of experience in my joblife. I understood the Supervising is so crucial than designig plan or just consulting. In my perspective if a person whose name is engineer , he or she should know how a plan should be better. I have always one unwriten rul im my job , Supervising has always integral part in our job.