Central MechRoom BIM|2022|Azin Mall Project|Shiraz

Central MechRoom BIM|2022|Azin Mall Project|Shiraz

Project type : Comercial

Application : Mall

Year : June-2022

Location : Shiraz-IRI

 

Additional Information and Details: I Designed that project with Revit and HVAC Solution, but we needed BOM (Bill Of Material) and an isometric plan. Thats Why I redesigned it with Plant3d. Plant 3d gives us a lot of opportunity such as BOM list, Isometric plan, 3d plan and it was very fast and easy to work.



 

 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
Central MechRoom BIM|2022|Mall Project|Shiraz

Central MechRoom BIM|2022|Mall Project|Shiraz

Project type : Mall

Application : Central Mech Room Designe by BIM method and Revit MEP.

Year : 2022

Location : Shiraz-IRAN

 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
Steam Mech Room | Industrial |Shiraz 2021

Steam Mech Room | Industrial |Shiraz 2021

Project type : Industrial

Application : Industrial Food process

Year : Dec-2021

Location : Fars Province-IRI

 

Additional Information and Details:  In that project I had duty to designe and simulation steam mech room for Industrial Food process and designe central mech room for air conditioning . It was very complicated and i had to consider every thing about dripper and condance line. All issues realted to steam ware dasigned based on SpiraxSarco Standard and All issues related to hydraulic were designed based on Ashrea Standard .

 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
BIM | Emam Ali Day Clinic | Fasa 2021

BIM | Emam Ali Day Clinic | Fasa 2021

Project type : Day Clinic

Application : BIM - 3D - Piping Simulation - Mech Room - Full Air Conditioning

Year : 2020-2021

Location : IRI - Fasa

 

Additional Information and Details: I designed and simulation that project 2 years ago. Now, thats construction process restart again. It has some wonderful and special issues like, surgery room and a small mech room that was located on the roof. Another thing that I had to take in my consideration is, everything that was designed in that project needed specific details.

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
Chiler Piping | Shiraz municipality |Shiraz 2021

Chiler Piping | Shiraz municipality |Shiraz 2021

Project type : Office

Application : Chiller Piping Design - Observating - 3d - BIM

Year : 2021

Location : IRI - Shiraz

Additional Information and Details:  That Project was related to Shiraz central municipality building. It was very important and critical. Everything and every detail were very special and I had to check it. So BIM method was very helpful and useful. I had to design piping and estimate install conditions for the 3700kw air-cooled chiller.

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
Air Condition Analyse | 2021 |Residential Project | Shiraz

Air Condition Analyse | 2021 |Residential Project | Shiraz

Project type : Residential

Application : 3D -Air Condition - Heating and Cooling- Analyse

Year : 2021

Location : IRI - Shiraz

 

Additional Information and Details: Full load Cooling and heating capacity of that buildings were analyzed. That residential project has included 3 high-rise towers. Air-condition is provided by the central mech room. Thats why, the correction of calculation and simulation was very crucial.

 

 

 

 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
HVAC Duct Simulation | 2021 |Mall Project | Shiraz

HVAC Duct Simulation | 2021 |Mall Project | Shiraz

Project type : Complex Mall

Application : BIM - 3D - Duct Design and Simulation

Year : 2021

Location : IRI - Shiraz

Additional Information and Details: The level of sound was very important and critical for my client. That's why I tried to simulation its line in Revit. There fore according to thats result, in the primary; line our airspeed didn't increase from 1800fpm and in the secondary line our airspeed was under 700fpm. Also, I had to considered the height of the ceiling.

 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
HVAC MechRoom Designe | 2021 |Mall Project | Shiraz

HVAC MechRoom Designe | 2021 |Mall Project | Shiraz

Project type : Complex Mall

Application : MechRoom - BIM - Constulting - Piping - 3D

Year : 2021

Location : IRI - Shiraz

Additional Information and Details: According to that building have various applications such as restaurant, day clinic, hotel, mall, that's mech room location was very difficult. I had to consider the level of noise, near to main pipe, air-cooled equipment, maintenance, efficiency. On the other hand, my client wanted to fund a very luxurious restaurant on the roof. Finally, I found a place and try to establish a mech room based on two-level. The first level only for pumps and collectors and the second level only for air-cooled equipment like chillers.


 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
Designe and calculate full HVAC system | 2021 |Mall Project | Shiraz

Designe and calculate full HVAC system | 2021 |Mall Project | Shiraz

Project type : Shopping Center

Application : Calculation - Piping - Fresh Air - Duct - Simulation - Mech Room - 2d AutoCad

Year : 2021

Location : IRI - Shiraz

Additional Information and Details: That project is located in the center of Shiraz city. First of all, it needs enough fresh air for people who shopping or eating their food in the food court. That's why I should consider at least 15 cfm fresh air for all people and also air change based on the Ashrea principle. The amount of efficiency of that system is very important for my client, on the other hand, it is very critical that the system should responsible for peak load situation. More Over, the final expenses of material were very important for my client, For that reason, I had to design that piping system according to reverse flow with tow pipe.



 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
chiller Installation | Shiraz municipality |Shiraz 2021

chiller Installation | Shiraz municipality |Shiraz 2021

ادامه مطلب...