Air Conditioning Designer

۳۳ مطلب با کلمه‌ی کلیدی «Chiller» ثبت شده است

Air Condition Analyse | 2021 |Residential Project | Shiraz

Air Condition Analyse | 2021 |Residential Project | Shiraz

Project type : Residential

Application : 3D -Air Condition - Heating and Cooling- Analyse

Year : 2021

Location : IRI - Shiraz

 

Additional Information and Details: Full load Cooling and heating capacity of that buildings were analyzed. That residential project has included 3 high-rise towers. Air-condition is provided by the central mech room. Thats why, the correction of calculation and simulation was very crucial.

 

 

 

 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
HVAC Duct Simulation | 2021 |Mall Project | Shiraz

HVAC Duct Simulation | 2021 |Mall Project | Shiraz

Project type : Complex Mall

Application : BIM - 3D - Duct Design and Simulation

Year : 2021

Location : IRI - Shiraz

Additional Information and Details: The level of sound was very important and critical for my client. That's why I tried to simulation its line in Revit. There fore according to thats result, in the primary; line our airspeed didn't increase from 1800fpm and in the secondary line our airspeed was under 700fpm. Also, I had to considered the height of the ceiling.

 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
HVAC MechRoom Designe | 2021 |Mall Project | Shiraz

HVAC MechRoom Designe | 2021 |Mall Project | Shiraz

Project type : Complex Mall

Application : MechRoom - BIM - Constulting - Piping - 3D

Year : 2021

Location : IRI - Shiraz

Additional Information and Details: According to that building have various applications such as restaurant, day clinic, hotel, mall, that's mech room location was very difficult. I had to consider the level of noise, near to main pipe, air-cooled equipment, maintenance, efficiency. On the other hand, my client wanted to fund a very luxurious restaurant on the roof. Finally, I found a place and try to establish a mech room based on two-level. The first level only for pumps and collectors and the second level only for air-cooled equipment like chillers.


 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
Designe and calculate full HVAC system | 2021 |Mall Project | Shiraz

Designe and calculate full HVAC system | 2021 |Mall Project | Shiraz

Project type : Shopping Center

Application : Calculation - Piping - Fresh Air - Duct - Simulation - Mech Room - 2d AutoCad

Year : 2021

Location : IRI - Shiraz

Additional Information and Details: That project is located in the center of Shiraz city. First of all, it needs enough fresh air for people who shopping or eating their food in the food court. That's why I should consider at least 15 cfm fresh air for all people and also air change based on the Ashrea principle. The amount of efficiency of that system is very important for my client, on the other hand, it is very critical that the system should responsible for peak load situation. More Over, the final expenses of material were very important for my client, For that reason, I had to design that piping system according to reverse flow with tow pipe.



 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
chiller Installation | Shiraz municipality |Shiraz 2021

chiller Installation | Shiraz municipality |Shiraz 2021

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
نقش سایه بان در بازدهی تجهیزات تهویه مطبوع

نقش سایه بان در بازدهی تجهیزات تهویه مطبوع

با توجه به گرم شدن سریع زمین و قرار گیری کشور ایران در منطقه خشک و گرم جغرافیایی و رسیدن میانگین دمایی برخی نقاط به بالای 45 درجه سانتی گراد , میزان مصرف انرژی برق در فصول گرم سال بسیار زیاد شده است و از طرفی بازدهی تجهیزات تهویه مطبوع به دلیل بالا رفتن دمای طرح بیرون پایین آمده است.

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
کاهش صدا در چیلرها

کاهش صدا در چیلرها

پیش از هر چیز نیاز است تعریف کاملی از صدا و مفهوم فیزیکی آن داشته باشیم , قطعاً تعریف جامع در واقعی تر شدن راه حل های اجرایی تاثیر بسیار زیادی خواهد داشت

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
HVAC Calculation |Mall Building |Shiraz 2020

HVAC Calculation |Mall Building |Shiraz 2020

I have always been a big fan of using some program to calculate a project. You Know find it wiser and a practical method to will get better conditions in our project.

So, my projects were analyzed by tow program HAP (Hourly Analysis Program) and Revit.

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
Mech Room |Public Building |Shiraz2020

Mech Room |Public Building |Shiraz2020

۰ نظر موافقین ۰ مخالفین ۰
BIM Project | Shiraz 2020 | ResidentialProject

BIM Project | Shiraz 2020 | ResidentialProject

Some people believe using a development program to do our work is exactly a waste of time but I argue against them. In my view using that program leads us to wise and so smart do working and the obvious result of this is significantly reduce the rate of re-working.

Revit is a most practical program that helps me in every project, no difference what kind of project, the reason that is all project spend a lot of money and time wich both of them are valuable property for everyone. I am keen on caring for my client.

This is one of the recent projects that I have started to cooperate with them in Shiraz city. I try to estimate everything for them such as location, cooling load, maintenance area place and ...

Linkedin Logo

۰ نظر موافقین ۰ مخالفین ۰