Project type : Comercial
Application : Mall
Year : June-2022
Location : Shiraz-IRI
Additional Information and Details: I Designed that project with Revit and HVAC Solution, but we needed BOM (Bill Of Material) and an isometric plan. Thats Why I redesigned it with Plant3d. Plant 3d gives us a lot of opportunity such as BOM list, Isometric plan, 3d plan and it was very fast and easy to work.
Project type : Mall
Application : Central Mech Room Designe by BIM method and Revit MEP.
Year : 2022
Location : Shiraz-IRAN
Some people believe using a development program to do our work is exactly a waste of time but I argue against them. In my view using that program leads us to wise and so smart do working and the obvious result of this is significantly reduce the rate of re-working.
Revit is a most practical program that helps me in every project, no difference what kind of project, the reason that is all project spend a lot of money and time wich both of them are valuable property for everyone. I am keen on caring for my client.
This is one of the recent projects that I have started to cooperate with them in Shiraz city. I try to estimate everything for them such as location, cooling load, maintenance area place and ...
A new project in Shiraz with a special condition on air conditioning design, Because of its kind of hospital. I tried to design that project with the two-pipe reverse flow.
For the reason that my client would like to control the temperature in every space with the separated system, I designed that system by the fan coil.
In addition, the situation of the mech room was very crucial for him, for that reason I predicted that place very carefully on the roof. Same as other time The #BIM method and #Revit was very practical and useful for me.
#Revit #MEP #BIM #Shiraz #2020 These days HVAC equipment are very expensive and everything related to them is crucially important for every client. That is why I try serieslly to satisfy my clients by reducing rework on their projects. For that reason, they can save more money, because they don't need to pay more money for rework. In this project, my client hasn't enough space to air-cooled chillers, That is why I found very useful space for that units, To my mind #REVIT and #BIM, is the best and best ways to achieve best goals.