HVAC | BIM |CONTROL | ENERGY | STEAM

۲۸ مطلب با کلمه‌ی کلیدی «BIM» ثبت شده است

Central MechRoom BIM|2022|Azin Mall Project|Shiraz

Central MechRoom BIM|2022|Azin Mall Project|Shiraz

Project type : Comercial

Application : Mall

Year : June-2022

Location : Shiraz-IRI

 

Additional Information and Details: I Designed that project with Revit and HVAC Solution, but we needed BOM (Bill Of Material) and an isometric plan. Thats Why I redesigned it with Plant3d. Plant 3d gives us a lot of opportunity such as BOM list, Isometric plan, 3d plan and it was very fast and easy to work.



 

 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
Central MechRoom BIM|2022|Mall Project|Shiraz

Central MechRoom BIM|2022|Mall Project|Shiraz

Project type : Mall

Application : Central Mech Room Designe by BIM method and Revit MEP.

Year : 2022

Location : Shiraz-IRAN

 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
BIM | Emam Ali Day Clinic | Fasa 2021

BIM | Emam Ali Day Clinic | Fasa 2021

Project type : Day Clinic

Application : BIM - 3D - Piping Simulation - Mech Room - Full Air Conditioning

Year : 2020-2021

Location : IRI - Fasa

 

Additional Information and Details: I designed and simulation that project 2 years ago. Now, thats construction process restart again. It has some wonderful and special issues like, surgery room and a small mech room that was located on the roof. Another thing that I had to take in my consideration is, everything that was designed in that project needed specific details.

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
Chiler Piping | Shiraz municipality |Shiraz 2021

Chiler Piping | Shiraz municipality |Shiraz 2021

Project type : Office

Application : Chiller Piping Design - Observating - 3d - BIM

Year : 2021

Location : IRI - Shiraz

Additional Information and Details:  That Project was related to Shiraz central municipality building. It was very important and critical. Everything and every detail were very special and I had to check it. So BIM method was very helpful and useful. I had to design piping and estimate install conditions for the 3700kw air-cooled chiller.

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
Air Condition Analyse | 2021 |Residential Project | Shiraz

Air Condition Analyse | 2021 |Residential Project | Shiraz

Project type : Residential

Application : 3D -Air Condition - Heating and Cooling- Analyse

Year : 2021

Location : IRI - Shiraz

 

Additional Information and Details: Full load Cooling and heating capacity of that buildings were analyzed. That residential project has included 3 high-rise towers. Air-condition is provided by the central mech room. Thats why, the correction of calculation and simulation was very crucial.

 

 

 

 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
HVAC MechRoom Designe | 2021 |Mall Project | Shiraz

HVAC MechRoom Designe | 2021 |Mall Project | Shiraz

Project type : Complex Mall

Application : MechRoom - BIM - Constulting - Piping - 3D

Year : 2021

Location : IRI - Shiraz

Additional Information and Details: According to that building have various applications such as restaurant, day clinic, hotel, mall, that's mech room location was very difficult. I had to consider the level of noise, near to main pipe, air-cooled equipment, maintenance, efficiency. On the other hand, my client wanted to fund a very luxurious restaurant on the roof. Finally, I found a place and try to establish a mech room based on two-level. The first level only for pumps and collectors and the second level only for air-cooled equipment like chillers.


 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
chiller Installation | Shiraz municipality |Shiraz 2021

chiller Installation | Shiraz municipality |Shiraz 2021

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
HVAC Calculation |Mall Building |Shiraz 2020

HVAC Calculation |Mall Building |Shiraz 2020

I have always been a big fan of using some program to calculate a project. You Know find it wiser and a practical method to will get better conditions in our project.

So, my projects were analyzed by tow program HAP (Hourly Analysis Program) and Revit.

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
Supervising Ag2020 |Day Clinic |Hospital Fasa

Supervising Ag2020 |Day Clinic |Hospital Fasa

After spending some years and gaining practice of experience in my joblife. I understood the Supervising is so crucial than designig plan or just consulting. In my perspective if a person whose name is engineer , he or she should know how a plan should be better. I have always one unwriten rul im my job , Supervising has always integral part in our job.

Linkedin Logo

۰ نظر موافقین ۰ مخالفین ۰
Designe Surgery Room |Day Clinic |Hospital Fasa

Designe Surgery Room |Day Clinic |Hospital Fasa

One of the crucially important aspects of air_conditioning is the calculation and designing a surgery room in a hospital wich my client is very obsessive and sensitive about everything that should be in his project. So I struggling to do my best for him and in that way Revit and BIM method the same as all-time support and help me. Now I should say thanks to autodesk for producing revit and motivating me to learn BIM.

Linkedin Logo

۰ نظر موافقین ۰ مخالفین ۰