Air Conditioning Designer

۱۱ مطلب با کلمه‌ی کلیدی «MechRoom» ثبت شده است

Central MechRoom BIM|2022|Azin Mall Project|Shiraz

Central MechRoom BIM|2022|Azin Mall Project|Shiraz

Project type : Comercial

Application : Mall

Year : June-2022

Location : Shiraz-IRI

 

Additional Information and Details: I Designed that project with Revit and HVAC Solution, but we needed BOM (Bill Of Material) and an isometric plan. Thats Why I redesigned it with Plant3d. Plant 3d gives us a lot of opportunity such as BOM list, Isometric plan, 3d plan and it was very fast and easy to work.



 

 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
Central MechRoom BIM|2022|Mall Project|Shiraz

Central MechRoom BIM|2022|Mall Project|Shiraz

Project type : Mall

Application : Central Mech Room Designe by BIM method and Revit MEP.

Year : 2022

Location : Shiraz-IRAN

 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
Steam Mech Room | Industrial |Shiraz 2021

Steam Mech Room | Industrial |Shiraz 2021

Project type : Industrial

Application : Industrial Food process

Year : Dec-2021

Location : Fars Province-IRI

 

Additional Information and Details:  In that project I had duty to designe and simulation steam mech room for Industrial Food process and designe central mech room for air conditioning . It was very complicated and i had to consider every thing about dripper and condance line. All issues realted to steam ware dasigned based on SpiraxSarco Standard and All issues related to hydraulic were designed based on Ashrea Standard .

 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
HVAC MechRoom Designe | 2021 |Mall Project | Shiraz

HVAC MechRoom Designe | 2021 |Mall Project | Shiraz

Project type : Complex Mall

Application : MechRoom - BIM - Constulting - Piping - 3D

Year : 2021

Location : IRI - Shiraz

Additional Information and Details: According to that building have various applications such as restaurant, day clinic, hotel, mall, that's mech room location was very difficult. I had to consider the level of noise, near to main pipe, air-cooled equipment, maintenance, efficiency. On the other hand, my client wanted to fund a very luxurious restaurant on the roof. Finally, I found a place and try to establish a mech room based on two-level. The first level only for pumps and collectors and the second level only for air-cooled equipment like chillers.


 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
Designe and calculate full HVAC system | 2021 |Mall Project | Shiraz

Designe and calculate full HVAC system | 2021 |Mall Project | Shiraz

Project type : Shopping Center

Application : Calculation - Piping - Fresh Air - Duct - Simulation - Mech Room - 2d AutoCad

Year : 2021

Location : IRI - Shiraz

Additional Information and Details: That project is located in the center of Shiraz city. First of all, it needs enough fresh air for people who shopping or eating their food in the food court. That's why I should consider at least 15 cfm fresh air for all people and also air change based on the Ashrea principle. The amount of efficiency of that system is very important for my client, on the other hand, it is very critical that the system should responsible for peak load situation. More Over, the final expenses of material were very important for my client, For that reason, I had to design that piping system according to reverse flow with tow pipe.



 

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰
Mech Room |Public Building |Shiraz2020

Mech Room |Public Building |Shiraz2020

۰ نظر موافقین ۰ مخالفین ۰
Designe and calculate full HVAC system |Mehraban |Hospital Project | Shiraz

Designe and calculate full HVAC system |Mehraban |Hospital Project | Shiraz

A new project in Shiraz with a special condition on air conditioning design, Because of its kind of hospital. I tried to design that project with the two-pipe reverse flow.

For the reason that my client would like to control the temperature in every space with the separated system, I designed that system by the fan coil.

In addition, the situation of the mech room was very crucial for him, for that reason I predicted that place very carefully on the roof. Same as other time The #BIM method and #Revit was very practical and useful for me.

Linkedin Logo

۰ نظر موافقین ۰ مخالفین ۰
Design and calculate Mech Room | Mohandesi Sazan |Office Project | Shiraz

Design and calculate Mech Room | Mohandesi Sazan |Office Project | Shiraz

 

 

Linkedin Logo

۰ نظر موافقین ۰ مخالفین ۰

Design and calculate Mech Room | Shiraz Airport |Public Project | Shiraz


 

۰ نظر موافقین ۰ مخالفین ۰
ریخت شناسی موتورخانه

ریخت شناسی موتورخانه

با توجه بیشتر شدن نیاز ساختمان ها به موتورخانه های استاندارد , می بایست در مورد نحوه ی جانمایی تجهیزات و مساحت اشغال شده موتورخانه بیشتر تحقیق و بررسی کرد. موارد مهم در انتخاب شرایط موتورخانه به شرح ذیل می باشد .

اول : تعیین و محاسبه دقیق تجهیزات مورد نیاز : چیلرجذبی یا تراکمی , پمپ سیرکولاسیون تهویه مطبوع ,بویلرها , سختی گیر , منابع تامین آب گرم , پمپ سیرکولاسیون برج های خنک کننده , ژنراتور , پمپ های آبرسانی , مخازن ذخیره آب و , محل تابلو برق ها , پمپ های اطفا حریق و ....

دوم : جلسه مشترک : با حضور کارفرما , پیمانکاران , مشاوران و طراحان تاسیات و معمار پروژه

سوم : جانمایی دقیق تجهیزات : با هماهنگی عوامل تصمیم گیرنده پروژه

ادامه مطلب...
۰ نظر موافقین ۰ مخالفین ۰